Endpoints: 135,119MCP servers: 37,175Payout addresses: 4,214Paid calls: 7,190Letters: 91Defects: 3,780counted 2 min ago
teppi

MCP serverza.co.getestimated/sa-estimate

South African building costs: rates, material price index, quick estimates, quote checks, BOQs
UNRATEDActivestreamable-httpgetestimated.co.za

Overview

Score?
UNRATED 0.000
of what a free look can see, on 2 looks
Looks
2
last 10 hr ago
Tools
10
changed 10 hr ago

More info

URL
getestimated.co.za/api/mcp/estimate
streamable-http
Says it is
getestimated-costs 1.0.0
protocol 2025-06-18
In the record since
2 days ago

Among servers37,175 with a card

0median 0.506 · this server 0.000 · highest on record 0.8351

Toolsfrom sha256:6de3eab1a9…9311da · +2 −1 10 hr ago

The tools this server lists, read out of the definition it returned
ToolSchema
compare_bill_to_quote
Compares a builder's or subcontractor's quote, line by line, with the user's OWN estimate for that project: each quote line is matched to the closest item of the same unit in the e
input · no output
estimate_from_brief
Makes a new early-stage cost estimate (a priced bill of quantities by Estie, GetEstimatED's estimator) from a written brief — no drawings needed — in a new project in the user's ow
input · no output
get_my_bill
Returns one of the user's own estimates (bill of quantities made by Estie): totals excl./incl. VAT with the likely range, contingency, the value per trade, how much of it is priced
input · no output
list_my_projects
Lists the projects in the user's own GetEstimatED account with each project's latest estimate (status, total incl. VAT when ready) and the wallet balance in rand. Use it first to f
input · no output
sa_building_rate_lookup
Approximate all-in South African building rate for an item of work (materials + labour + plant + contractor margin, excl. VAT) per unit, e.g. "230 mm brick wall" per m², "concrete
input · no output
sa_check_quote
Checks the line rates in a South African building or repair quote against GetEstimatED's rate guide: each recognised line is marked below, in or above the usual range for the provi
input · no output
sa_material_price_index
Indicative South African retail price of a building material (cement, bricks, sand, timber, roof sheeting, ceiling board, paint, tiles, sanitaryware …): the median price per unit i
input · no output
sa_quick_estimate
Ballpark cost to build a house (or an addition) in South Africa from its floor area: low, expected and high in rand, excl. and incl. VAT, from the published rate per m² for the qua
input · no output
top_up_wallet added
Adds money to the user's GetEstimatED pay-as-you-go wallet: topup_100 = R100, topup_250 = R250, topup_500 = R500, topup_1000 = R1 000 (VAT included, South African rand). TWO STEPS:
input · no output
wallet_balance added
Shows the user's pay-as-you-go wallet: the balance in rand and the last top-ups and estimates (rand amounts only). Pro accounts are unlimited and have no wallet. Read-only. Needs t
input · no output
buy_estimate_pack removed
Buys estimate credits for the user's GetEstimatED account: pack_10 = 10 AI estimates for R399, pack_1 = 1 AI estimate for R49 (once-off, VAT included, South African rand). TWO STEP
—
Verify it yourselfnpx teppi-check https://getestimated.co.za/api/mcp/estimatecurl -s https://api.teppi.xyz/v1/trust/mcp/mcs_01M8B6F6TDX4BDW32YETYZN8GV