MCP servercom.harrowgategroup/tools

Planning tools for commercial paving and site work.
UNRATEDActivestreamable-httpharrowgategroup.com

Overview

Score?
UNRATED 0.143
of what a free look can see, on 1 looks
Looks
1
last 1 day ago
Tools
12

More info

URL
harrowgategroup.com/mcp
streamable-http
Says it is
harrowgate-free-tools 1.0.0
protocol 2025-06-18
In the record since
1 day ago

Among servers32,723 with a card

0median 0.547 · this server 0.143 · highest on record 0.8351

Toolsfrom sha256:9d3373fa9f…4e4669

The tools this server lists, read out of the definition it returned
ToolSchema
accessible_parking_calculator
Minimum accessible parking spaces for a new or redeveloped Ontario lot under Ontario Regulation 191/11 section 80.36, the Type A and Type B split, access aisles and painted stall l
input · no output
asphalt_concrete_calculator
Tonnes of hot mix asphalt for a paving area, or cubic metres and truck loads of ready-mix concrete for a slab, footing or column. Every parameter is optional and has a default. Mat
input · no output
concrete_slab_thickness_and_reinforcing_guide
Minimum slab thickness, subbase, joint spacing, joint depth and reinforcing notes for a walk, patio, driveway, parking lot or truck pad, from published ready-mix concrete associati
input · no output
curb_sidewalk_concrete_calculator
Concrete volume, order quantity and ready-mix truck loads for a run of sidewalk, curb or curb and gutter, with an Ontario accessible path width check. Every parameter is optional a
input · no output
excavation_spoil_volume_calculator
Bank volume, loose volume after swell and truck loads for a trench or pit, with vertical or sloped walls. Every parameter is optional and has a default. Preliminary planning only.
input · no output
excess_soil_tracker_and_reuse_site_checker
Which parts of Ontario Regulation 406/19 apply to a soil removal project or a reuse site, and the records to keep, based on soil volume, past land use and where the soil is going.
input · no output
gravel_and_granular_base_calculator
Tonnes, cubic metres, truck loads and the number of compaction lifts for a Granular A or Granular B base, using the 150 mm lift limit in Toronto standard specification TS 501. Ever
input · no output
hydro_excavation_vs_mechanical_checker
Which excavation method the Electrical Safety Authority guideline allows near a located underground electrical distribution line: hand, vacuum (hydro) or machine. Every parameter i
input · no output
parking_lot_striping_and_stall_layout_calculator
Stalls per row, rows, total stalls, painted stall line length and the minimum accessible spaces for a lot, using the stall sizes and drive aisle widths in Toronto Zoning By-law 569
input · no output
rebar_quantity_calculator
Bar count, total length, stock bars and mass for a slab or pad mat or a strip footing, using CSA G30.18 metric bar sizes. Every parameter is optional and has a default. Preliminary
input · no output
snow_load_and_snow_removal_volume_calculator
Cubic metres, weight and truck loads of snow from a lot area and snow depth, with the footprint and base width of a snow pile of a chosen height. Every parameter is optional and ha
input · no output
trench_shoring_checker
Whether Ontario Regulation 213/91 requires a support system for an excavation, by depth, width and soil type, which kinds are permitted, and which other excavation rules apply. Eve
input · no output